retour imprimer

Policy Brief #1: The state of Water Resources in the Al Ostuan River Basin



outil d'aide à la décision Mar 2021 ; 4 pages
Ed. ACTED - Beirut
Téléchargeable sous format: PdF (910 ko)
   Baseline report    Report on future scenarios Résumé:
This policy brief resulted from the study of Al-Ostuan River Basin and from an Integrated Water Resource Management approach to call for action and concrete measures. It presents the situation, main issues and needs in terms of:
- water demand and supply
- water resource availability and water supply reliability
- water quality and pollution

Mots clefs:

accès à l'eau (CI) (DT) (OP) , gestion de la ressource en eau (CI) (DT) (OP) , pollution de l'eau (CI) (DT) (OP)

Pays concerné:

Liban (CI) (DT) (OP)

Editeur/Diffuseur:

ACTED - Beirut - Liban
    

En cas de lien brisé, nous le mentionner à communication@pseau.org

   © pS-Eau 2024