retour imprimer

Al Ostuan Programme of Measures and Action Plan Completion Report



decision support instrument Feb 2023 ; 14 pages
Ed. ACTED - Beirut BTD - Beirut
Downloadable format: PdF (550 ko)
Abstract:
Under the HawkaMaa-EU project, river basin management approach was integrated and the work of the consortium revolved around 3 river basins (Al Assi, Al Oustuan, Al Ghadir). ACTED have allocated BTD to conduct a water balance study around Al Oustuan river basin. The study suggests various interventions and measures (technological, legislative, regulatory, financial, etc.) to achieve efficient water use by all sectors of the community (urban/ domestic, agricultural, industrial, etc.) The proposed measures have the potential to reduce unmet water demand in Al Ostuan, between 12.5 Mm3 and 118 Mm3 for the entire 2019 – 2035 period.
Contents:
1. Introduction ............................................................................... 3
2. Al Ostuan Policy Targets, Programme of Measures and Action Plan ................................................................................ 5
2.1. Policy Targets and Programme of Measures ................................................ 5
2.2. Action Plan ................................................................................................... 7
3. Main Measures .......................................................................... 9
4. Conclusion .............................................................................. 14

Target Audiences:

All public , Cooperation actors , Local and national decision makers

Keyword:

management practices / governance (CI) (DT) (ET)

Country:

Lebanon (CI) (DT) (ET)

Publishers/Broadcasters:

ACTED - Beirut - Lebanon
    

BTD - Bureau Technique pour le Développement - Beirut - Lebanon
    

If there is a broken link, we will be pleased to receive a message: communication@pseau.org

   © pS-Eau 2025