DRAFT- Rehabilitation and Extension project for Ablah Water Reuse System, Bekaa Lebanon | ||||||
rapport Nov 2022 ; 53 pages ![]() Aut. Marie-Hélène Nassif Ed. IWMI - Colombo Téléchargeable sous format: PdF ![]() Résumé: The following report presents the summary1 study related to Ablah WWTP, a small domestic, trickling filter-based treatment plant (2,000 m3/day) managed by the municipality of Ablah town, in Central Bekaa, Lebanon. The study presents a plan for the rehabilitation of an existing irrigation reuse system (20 ha/30 farmers) and its extension to supply 12.3 ha more lands.
|
||||||
En cas de lien brisé, nous le mentionner à communication@pseau.org |